Drywall Contractor in Arlington, VA
Drywall installation, taping, finishing and repair in Arlington, VA, for brownstones, row houses and older plaster, from Clarendon to Ballston.
- StateVirginia
- ClimateThe Northeast
- Dry time a coat29 to 35 hours

Drywall in Arlington looks like this
Older plaster-and-lath homes, brownstones and row houses call for careful skim coating and patching, and tight city sites call for strong dust control. Cold winters mean the heat must be on for compound to dry.
Around Shirlington and Rosslyn, dust control and careful patching matter on every visit.
We hang, tape, finish and repair drywall around Clarendon, Ballston, Shirlington and Rosslyn and the streets between them in Arlington.
In April the air in Arlington is about 60 percent humidity, so a thin coat needs roughly 29 hours, and a taped three-coat finish takes about 5 days.
Typical outdoor humidity for the region, used as a planning guide. Your own rooms, heat and airflow change it.
When to schedule drywall in Arlington
Compound dries by losing water, so the humidity decides the pace. A thin coat can be ready the next day in dry air and needs two days in damp air. The two seasons below bracket what to expect in Arlington.
- Slowest monthSeptemberAbout 70 percent humidity, 35 hours between coats, about 6 days for a taped three-coat finish.
- Fastest monthAprilAbout 60 percent humidity, 29 hours between coats, about 5 days for a taped three-coat finish.
What people in Arlington ask for
Taping, Mudding and FinishingSkim Coating Walls and CeilingsA thin coat that hides texture, patches and old damageSee details
Taping, Mudding and FinishingLevel 5 Drywall FinishThe smoothest finish, for glossy paint and low raking lightSee details
Drywall Repair and RestorationDrywall Crack RepairCracks fixed at the cause, not just covered with paintSee details
Remodeling and Wall PrepInterior Demolition and Wall RemovalOpen up a floor plan with dust control and a clean haul-awaySee details
Drywall Installation and HangingSoundproof Drywall and Sound WallsQuieter rooms for theaters, bedrooms, offices and shared wallsSee details
Taping, Mudding and FinishingDrywall Sanding and Dust ControlSmooth sanding with the dust kept in a bag, not in your homeSee details
Drywall in Arlington, answered
Do you do drywall work in Arlington, VA?
Yes. DrywallerZ hangs, tapes, finishes and repairs drywall in Arlington and neighborhoods such as Clarendon, Ballston, Shirlington and Rosslyn. The closest other city we serve is Washington, DC, about 3.4 miles northeast.
How long does drywall take to dry in Arlington?
Typical humidity in Arlington gives about 29 to 35 hours between coats of joint compound, so a taped three-coat finish takes roughly 5 to 6 days depending on the month.
What drywall services are popular in Arlington?
Many customers in Arlington choose skim coating walls and ceilings, level 5 drywall finish, drywall crack repair. Every service has its own page, and one job can mix several of them.
How do I get a price for drywall in Arlington?
Call (800) 224-9245 or send the form on this page with your address in Arlington, the size of the project and what you need. We send a written price before any work starts.
Get your drywall done in Arlington
Call or send the form. We reply with a plan, a written price and the first day we can come.